Oi Mate! Adventure Carabiner Rope Lead

Sale price Price $35.00 Regular price

Long length Adventure Leads are perfect for those walks on the beach, hikes in the hills or runs in the park where you want to give your dog the freedom of an off-lead experience without compromising security or control. A practical solution to a common pet lovers pickle! 

  • Lead size: approx 9.5 foot (2.9m) from top of handle to end of carabiner

  • Rope diameter: 1.2cm (thick and durable)

  • Carabiner size:  Length 9.9cm x Width 5.9cm

  • Carabiner weight: 50 grams

  • Recommended for medium to larger sized dogs.

  • Suitable for use with most collars, except for metal choker chain slip style collars. 

    100% Australian owned, designed and assembled - Support Australian small business today!